Friday, May 25, 2012

Construction at 3 Staten Island bridges could slow getaway plans | SILive.com

Construction at 3 Staten Island bridges could slow getaway plans | SILive.com: "The state's 511 traffic alert system reported at 1 p.m. that bridge work is being done on both sides of the Bayonne Bridge, Goethals Bridge and the Outerbridge crossing."

'via Blog this'