Bayonne Bridge Construction Notice | The City of Bayonne, NJ: "The Port Authority advised the City of Bayonne about the following street closings which are related to Bayonne Bridge construction.
Juliette Street: Beginning Monday, January 6, the part of the roadway under the Bayonne Bridge will be closed. Vehicles can enter from Kennedy Boulevard and Avenue A for local access only. No through traffic will be allowed. Duration: Three weeks
4th Street: Beginning Monday, December 30, the portion of the roadway under the Bayonne Bridge will be closed. Vehicles can enter from Kennedy Boulevard and Avenue A for local access only. No through traffic will be allowed. Duration: Three weeks
3rd Street: Beginning Monday, December 30 the southern sidewalk and a portion of the street will be closed between Kennedy Boulevard and Avenue A. Traffic will be pushed to the north side of this section of 3rd Street. Duration: Two Years. In addition, the part of the roadway under the Bayonne Bridge will be closed. Vehicles can enter from Kennedy Boulevard and Avenue A for local access only. No through traffic will be allowed. Duration: Two Weeks
The Port Authority Hotline number is 855-265-5482."