JOC.com: "The port authority last month completed the dredging of its main channels to 50 feet. A $1.3 billion project to raise the Bayonne Bridge’s 151-foot vertical clearance to 215 feet is scheduled for completion at the end of 2017. The bridge raising will allow larger ships to reach all of the port’s four main container terminals instead of only Global, which lies outside the bridge."