Bridge Design & Engineering: "The 85-year-old arch bridge is being given the new deck as part of the Port Authority of New York & New Jersey’s “Raise the Roadway” initiative, a major operation to raise the level by 19.5m. The aim is to provide sufficient navigational clearance for the larger container vessels now using the expanded Panama Canal."