News and Views About the Past, Present, and Future of the Bayonne Bridge
Friday, August 4, 2017
11 months later, no sanctions for Bayonne developer accused of stealing water
Hudson County View: "The situation is notable because Skanska Koch Kiewit, a contractor for the Bayonne Bridge construction project, was agreed to pay Suez Water $32,360.40 on December 5th, 2016 for drawing water from a hydrant without a meter."