SILive.com: "The PA closed the bridge to traffic Sunday in both directions at around 10:50 a.m. on Sunday. The bridge reopened at 12:12 p.m. after the equipment was removed, said Joseph Pentangelo, a PA spokesman.
"ESU has secured the equipment,which was hanging. There was a visual inspection of the bridge and details to follow," he said."