Saturday, June 17, 2017

Featured Project: Bayonne Bridge Navigational Clearance Program (BBNCP) Construction Management

Greenman-Pedersen, Inc.: "The project involves building a new roadway 64 feet above the existing road. The new roadway includes two 30-foot-9-inch roadways with two 12-foot lanes each, a median divider, and 4-foot-9-inch shoulders. There is also a new bikeway and walkway being constructed along the entire length of the bridge, with access ramps to replace stairs."